Concrete is poured, the forms are off, sills bolted down on top of the concrete walls. An aiir barrier of doubled up 6 mill poly is then used to seal the rock vault off from the rest of the building - a very important detail to keep the barrel vault gases out of the room. The foundation is now ready for the walls, barrel vault and roof.
|