|
At this point the Subterranean Heating and Cooling System tubing is installed. The tubing crossing the floor area is being buried in pea-gravel. It will provide a base for a flagstone floor and permit good drainage. Included under the gravel is a perforated drain line running outside to daylight to keep the floor free of ground water.
|