Distro Early Construction

Previous
Back to Contact Sheet
Next
The excavation for the foundations left us with mounds of subsoil, high in clay and sand content. Here we are sifting the soil through a 1/4" screen. It will be integrated back into the building, lining the walls inside the straw bales with a layer thermal mass.