Distro Early Construction

Previous
Back to Contact Sheet
Next
After the first 4 foot long bamboo pins impale the bales, their exposed stubs are wired to the posts to hold the wall tight to the frame. Every bale on every row past the third level got two 4 foot long 3/4" bamboo pins driven home and wired to the frame.