Woodland Gardens Greenhouse - Construction

Previous
Back to Contact Sheet
Next
The side posts and outside bed walls are in place. The first few layers of a network of SHCS tubing is in place and buried. The design needed two blower plenums to keep the tubing lengths down to acceptable levels. The greenhouse will also include a large pond and hot tub when done. The cover went on November 2001.