<<<<---- Jump back to the Photo Album selections

Hybrid Powered Potter's Wheel - Construction

Previous
Back to Contact Sheet
Next
Even Mariya is expessed. Left to set up, the pour has to be monitored for at least a week, making sure that it does not dry out. For a structural concrete pour, the most strength as possible is needed. For this to happen, the chemistry needs constant humidity for at least a week.